Coal balancing took us dozens of days in the past.  Using PROMECON technology boiler tuning can be finished within a week and raises the quality of combustion. We have improved the combustion quality of biomass co-firing by using the MECONTROL Coal system for fuel balancing at our Amager plant. The Promecon UBC provides us with an on-line, real time solution providing rapid verification of the specification and compliance of our ash for onward sale. By means of extensive experience in balancing organs and methods, along with other detailed experience within Combustion Optimization, DONG Energy has been able to use the system with positive results at more than one area.
Coal balancing took us dozens of days in the past. Using PROMECON technology boiler tuning can be finished within a week and raises the quality of combustion.
Zhang Ming, EPRI, China
We have improved the combustion quality of biomass co-firing by using the MECONTROL Coal system for fuel balancing at our Amager plant.
Maria Smedberg,Thermal Engineering, Vattenfall, Denmark
The Promecon UBC provides us with an on-line, real time solution providing rapid verification of the specification and compliance of our ash for onward sale.
Jim Farmery, Drax Power, UK
By means of extensive experience in balancing organs and methods, along with other detailed experience within Combustion Optimization, DONG Energy has been able to use the system with positive results at more than one area.
Danny Olsen, DONG Energy, Denmark

Featured projects

Power

Kraftwerk Reuter West c by Axel Mauruszat

Vattenfall´s Power Station Reuter West in Berlin have optimized their combustion replacing conventional measurements by new PROMECON technology.  Find out about this and other projects...

Cement

HOLCIM chose 18 gas flow measurements for hot and dusty applications  of MECONTROL Air flowmeters to make the giant Ste. Genevieve Plant one of the most efficient and environmental friendly plant in the HOLCIM Group. More... 

Steel & Smelters

Thyssen Krupp in Duisburg had no solution to measure the hot and ignitable BOF exhaust gas. PROMECON’s correlation technology based System was the only applicable solution. More...

News and Events

Successful boiler optimization at Yuwang power plant in China

April 2016: PROMECON has carried out a successful boiler optimization project with China Huaneng Energy Group, Yuwang power plant in China.

more information